Firstpost
  • Home
  • Video Shows
    Vantage Firstpost America Firstpost Africa First Sports
  • World
    US News
  • Explainers
  • News
    India Opinion Cricket Tech Entertainment Sports Health Photostories
  • Asia Cup 2025
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
Trending:
  • PM Modi in Manipur
  • Charlie Kirk killer
  • Sushila Karki
  • IND vs PAK
  • India-US ties
  • New human organ
  • Downton Abbey: The Grand Finale Movie Review
fp-logo
'India on track to add 27, 000 circuit km power transmission lines by 2024,' say officials
Whatsapp Facebook Twitter
Whatsapp Facebook Twitter
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
  • Home
  • India
  • 'India on track to add 27, 000 circuit km power transmission lines by 2024,' say officials

'India on track to add 27, 000 circuit km power transmission lines by 2024,' say officials

Press Trust of India • July 13, 2022, 19:37:18 IST
Whatsapp Facebook Twitter

The power transmission network expansion has been planned keeping in mind the ultimate goal of having 500 GW of non-fossil fuel based electricity generation capacity in the county

Advertisement
Subscribe Join Us
Add as a preferred source on Google
Prefer
Firstpost
On
Google
'India on track to add 27, 000 circuit km power transmission lines by 2024,' say officials

New Delhi: India is poised to add 27,000 circuit kilometres of inter-state power transmission networks by 2024 as it has already added 6,500 circuit kilometres or almost one-fourth of the target. The power transmission network expansion has been planned keeping in mind the ultimate goal of having 500 GW of non-fossil fuel based electricity generation capacity in the county. “We have planned to add 27,000 circuit km of inter-state transmission network in the country, mainly focussing on evacuation of renewable energy in the country by December 2024. We have already completed 6,500 circuit km lines so far,” a senior power ministry official said. The official exuded confidence that India is on track to meet the target of adding 27,000 circuit kilometres as one-fourth of that is completed well within schedule. The official also informed that 10,000 circuit kilometres lines are already under construction while 10,500 circuit kilometres are at various stages of bidding or tendering. The inter-state transmission link plays an important role in power generation capacity addition. Solar projects are set up within a time frame of 15 to 18 month, whereas more time is required to set up the inter-state transmission link. Experts are of the view that transmission link to evacuate power from projects especially renewables should be set up much before the generation capacity is added. The official said, “We need to build transmission line well in advance so that the generation capacities are not stranded.” In order to facilitate faster development of power infrastructure in the country, 1,500 inter-state transmission lines are mapped on PM GatiShakti portal, covering 2 lakh circuit kilometres across the country. Earlier this month, power ministry had said that all Inter-State Transmission System (ISTS) lines have been mapped on the portal of the PM GatiShakti National Master Plan (NMP), which was launched in October, 2021 to push infrastructure development in the country. Also, it had informed that the 90 per cent under-construction ISTS lines have been integrated to the portal and the remaining 10 per cent are to be integrated after finalisation of route survey by respective transmission service providers. PM GatiShakti NMP portal provides “one-click comprehensive view” to steer and simplify the planning and implementation process by reduction of time and cost of implementation in power transmission projects, the statement said. The power ministry official also said that in addition to 27,000 circuit kilometres by 2024, India would need to build transmission lines to evacuate 180GW generation capacity, which will ultimately help the country to realise its gaol of having 500GW of renewable energy by 2030. Read all the  Latest News ,  Trending News ,  Cricket News ,  Bollywood News , India News  and  Entertainment News  here. Follow us on  Facebook,  Twitter and  Instagram.

Tags
Power Ministry Indian Power Ministry power transmission networks
End of Article
Latest News
Find us on YouTube
Subscribe
End of Article

Impact Shorts

'New dawn': PM Modi meets Manipur violence victims in first visit since 2023 unrest

'New dawn': PM Modi meets Manipur violence victims in first visit since 2023 unrest

Prime Minister Modi visited Churachandpur, Manipur, meeting displaced people from ethnic clashes. Modi laid foundation stones for 14 development projects worth over ₹7,300 crore in Churachandpur. Opposition criticized Modi's visit as "too little, too late" and questioned its impact on healing wounds.

More Impact Shorts

Top Stories

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Top Shows

Vantage Firstpost America Firstpost Africa First Sports

QUICK LINKS

  • Mumbai Rains
Latest News About Firstpost
Most Searched Categories
  • Web Stories
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Tech/Auto
  • Entertainment
  • IPL 2025
NETWORK18 SITES
  • News18
  • Money Control
  • CNBC TV18
  • Forbes India
  • Advertise with us
  • Sitemap
Firstpost Logo

is on YouTube

Subscribe Now

Copyright @ 2024. Firstpost - All Rights Reserved

About Us Contact Us Privacy Policy Cookie Policy Terms Of Use
Home Video Shorts Live TV