Firstpost
  • Home
  • Video Shows
    Vantage Firstpost America Firstpost Africa First Sports
  • World
    US News
  • Explainers
  • News
    India Opinion Cricket Tech Entertainment Sports Health Photostories
  • Asia Cup 2025
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
Trending:
  • PM Modi in Manipur
  • Charlie Kirk killer
  • Sushila Karki
  • IND vs PAK
  • India-US ties
  • New human organ
  • Downton Abbey: The Grand Finale Movie Review
fp-logo
Sanctions delayed LCA Tejas project: DRDO chief
Whatsapp Facebook Twitter
Whatsapp Facebook Twitter
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
  • Home
  • India
  • Sanctions delayed LCA Tejas project: DRDO chief

Sanctions delayed LCA Tejas project: DRDO chief

FP Archives • May 31, 2013, 19:59:20 IST
Whatsapp Facebook Twitter

The LCA is expected to cost around Rs200 crore per piece, which will still be much less than a foreign fighter of the same class, Saraswat said.

Advertisement
Subscribe Join Us
Add as a preferred source on Google
Prefer
Firstpost
On
Google
 Sanctions delayed LCA Tejas project: DRDO chief

New Delhi: Facing flak for time slippages in Light Combat Aircraft (LCA) Tejas programme, DRDO chief VK Saraswat today attributed the delay to “setbacks” caused by international sanctions and inadequate development of aerospace industry in the country. Saraswat, who retired today, contended that the DRDO had to start from the “scratch” to indigenously develop the fighter aircraft as the manufacturing base in the country was non-existent. He said these issues have now been addressed to a large extent and other versions of the combat aircraft can be developed in a short time.[caption id=“attachment_831793” align=“alignleft” width=“380”]DRDO chief VK Saraswat. Image courtesy PIB DRDO chief VK Saraswat. Image courtesy PIB[/caption] “We had to go through the rigours of development from the scratch where we had to develop the whole range of products. This is not a problem in foreign countries where everything is available whereas we had to develop everything,” the DRDO chief said. Saraswat said this when asked to explain the delay in the LCA programme which has not fructified even nearly three decades after it was initiated. His comments came two days after Defence Minister AK Antony criticised the “time slippages” in the project. Saraswat noted that the project to develop a Light Combat Aircraft was initiated in early 1980s but soon after Missile Transfer Control Regime (MTCR) came into effect in 1988. “All suppliers cancelled their agreements and European firms also stopped cooperation. When such a situation occurred, we had to do everything ourselves. This was a major setback,” said Saraswat, who also held the post of scientific advisor to the defence minister. This situation continued from 1980 till 2000 when the first aircraft was rolled out, he said. “Time was taken to overcome the blocks created by MTCR. This is the reason for the longer time taken,” he said. The DRDO chief said LCA was the first programme wherein a fighter plane had to be completely designed and developed indigenously in the country, a departure from the practice of manufacturing fighters of other countries under licence. “We did not have any industrial base for avionics, for material. When we wanted to do LCA, there was a lacuna in the whole system,” Saraswat said. He said this was because indigenous development of a fighter aircraft was never under consideration till 1980 and as a result of which the manufacturing base could not be created unlike other countries. Saraswat noted the policy pursued till then was to buy fighters off the shelf or manufacture them under licence from countries like USSR. After the collapse of USSR, India faced tremendous problems in getting spare parts. Talking about the LCA project, he said, “We have built all the systems for the LCA today but that resulted in extra money and extra time. That is not the inefficiency of the scientists or the management failure. It is basically bridging the technology gap and learning how large systems are done.” Saraswat said the DRDO and the HAL have addressed a number of problems found in the aircraft during its Initial Operational Clearance-I at Bangalore in 2001 and expressed hope that the aircraft would get its IOC-II by the end of this year. The LCA is expected to cost around Rs200 crore per piece, which will still be much less than a foreign fighter of the same class, Saraswat said. He said a big push was given under his tenure for the large scale production of the aircraft at the HAL facilities in Bangalore. PTI

Tags
HowThisWorks IAF VK Saraswat LCA Tejas
End of Article
Written by FP Archives

see more

Latest News
Find us on YouTube
Subscribe
End of Article

Impact Shorts

'New dawn': PM Modi meets Manipur violence victims in first visit since 2023 unrest

'New dawn': PM Modi meets Manipur violence victims in first visit since 2023 unrest

Prime Minister Modi visited Churachandpur, Manipur, meeting displaced people from ethnic clashes. Modi laid foundation stones for 14 development projects worth over ₹7,300 crore in Churachandpur. Opposition criticized Modi's visit as "too little, too late" and questioned its impact on healing wounds.

More Impact Shorts

Top Stories

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Top Shows

Vantage Firstpost America Firstpost Africa First Sports

QUICK LINKS

  • Mumbai Rains
Latest News About Firstpost
Most Searched Categories
  • Web Stories
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Tech/Auto
  • Entertainment
  • IPL 2025
NETWORK18 SITES
  • News18
  • Money Control
  • CNBC TV18
  • Forbes India
  • Advertise with us
  • Sitemap
Firstpost Logo

is on YouTube

Subscribe Now

Copyright @ 2024. Firstpost - All Rights Reserved

About Us Contact Us Privacy Policy Cookie Policy Terms Of Use
Home Video Shorts Live TV