Firstpost
  • Home
  • Video Shows
    Vantage Firstpost America Firstpost Africa First Sports
  • World
    US News
  • Explainers
  • News
    India Opinion Cricket Tech Entertainment Sports Health Photostories
  • Asia Cup 2025
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
Trending:
  • Charlie Kirk shot dead
  • Nepal protests
  • Russia-Poland tension
  • Israeli strikes in Qatar
  • Larry Ellison
  • Apple event
  • Sunjay Kapur inheritance row
fp-logo
No compromise on quality of Mumbai-Ahmedabad bullet train, says head of consultant firm for project
Whatsapp Facebook Twitter
Whatsapp Facebook Twitter
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit

No compromise on quality of Mumbai-Ahmedabad bullet train, says head of consultant firm for project

Asian News International • September 1, 2018, 16:16:48 IST
Whatsapp Facebook Twitter

The training institute, being made in Vadodara’s Lal Bagh area as part of the Mumbai-Ahmedabad bullet train project, has completed 15-20 percent and is ensuring that India doesn’t have to compromise on “quality and parameters” in the project.

Advertisement
Subscribe Join Us
Choose
Firstpost on Google
Choose
Firstpost on Google
No compromise on quality of Mumbai-Ahmedabad bullet train, says head of consultant firm for project

Vadodara: The training institute, being made in Vadodara’s Lal Bagh area as part of the Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, has completed 15-20 percent and is ensuring that India doesn’t have to compromise on “quality and parameters” in the project. During a visit to the location site of the training institute, Tarun Kathhpadia, Executive Team Leader, Japan International Consultants for Transportation Co Ltd (JIC), told ANI, “This is the Mumbai-Ahmedabad high-speed project’s training centre — the heart of the bullet train project. [caption id=“attachment_5094471” align=“alignleft” width=“380”]Representational image. PTI Representational image. PTI[/caption] The Japanese government is funding us and will give their technology to us. Later, the Japanese trainers will come here and will train us on how to run the bullet trains besides highlighting other technical aspects.” “Bullet train will run at a speed of 350 kilometres/hour. We have to ensure that in India also the bullet train runs with the same quality and parameters at which it runs in Japan. JIC is the supervising consultant. They are here to ensure that the work is done at the best quality, on time and under proper security measures. This institute project has been divided into three parts — TI 1, TI 2 and TI 3. We will give training to around 4,000 people here,” he added. On behalf of Japan, Kikuo Watanabe is looking after the training institute project. He said, “We have faced a lot of problem due to the monsoon and other situation recently. But, thankfully now we have good weather here and the progress is going on in full swing.” Meanwhile, the terminal hub for the project in Vadodara will be designed on the theme of ‘banyan tree,’ said Pradeep Ahirkar, Chief Project Manager, Vadodara. “The bullet train’s track will be higher by 23 metres (70 feet) compared to the existing conventional railway tracks,” Ahirkar said. The bullet train between Ahmedabad and Mumbai will run a total length of 508 kilometres, of which 21 kilometres will be covered in the tunnel under sea. The cost of the tunnel is estimated at Rs 3,500 crores. The cost of the total train project is Rs 1.10 trillion, and Japan is giving a loan of Rs. 88,000 crores for the same at a minimal interest of 0.1 per cent, which has to be repaid over 50 years.

Tags
India Gujarat Japan NewsTracker Mumbai Ahmedabad Maharashtra Japanese government Vadodara Mumbai Ahmedabad high speed rail Mumbai Ahmedabad Bullet Train project MAHSR Tarun Kathhpadia Kikuo Watanabe
  • Home
  • India
  • No compromise on quality of Mumbai-Ahmedabad bullet train, says head of consultant firm for project
End of Article
Latest News
Find us on YouTube
Subscribe
  • Home
  • India
  • No compromise on quality of Mumbai-Ahmedabad bullet train, says head of consultant firm for project
End of Article

Impact Shorts

News18 SheShakti 2025: Voices of cinema, sport and music redefine nation-building

News18 SheShakti 2025: Voices of cinema, sport and music redefine nation-building

At News18 SheShakti 2025 Delhi, women from sports, cinema, and music discussed breaking barriers. Kriti Sanon and Sanya Malhotra focused on equity in cinema, Mira Erda and Ashalata Devi on sports challenges, and Kavita Krishnamurti stressed humility and perseverance for lasting success.

More Impact Shorts

Top Stories

US ready to ‘impose costs’ on Russia if war in Ukraine drags on, says Hegseth

US ready to ‘impose costs’ on Russia if war in Ukraine drags on, says Hegseth

US tells Hamas to stop violence against Gaza civilians and disarm 'without delay'

US tells Hamas to stop violence against Gaza civilians and disarm 'without delay'

China seizes 60,000 maps mislabelling Taiwan, omitting South China Sea islands

China seizes 60,000 maps mislabelling Taiwan, omitting South China Sea islands

Syria’s Sharaa pledges to honor Russia ties, seeks economic and military support in Kremlin visit

Syria’s Sharaa pledges to honor Russia ties, seeks economic and military support in Kremlin visit

US ready to ‘impose costs’ on Russia if war in Ukraine drags on, says Hegseth

US ready to ‘impose costs’ on Russia if war in Ukraine drags on, says Hegseth

US tells Hamas to stop violence against Gaza civilians and disarm 'without delay'

US tells Hamas to stop violence against Gaza civilians and disarm 'without delay'

China seizes 60,000 maps mislabelling Taiwan, omitting South China Sea islands

China seizes 60,000 maps mislabelling Taiwan, omitting South China Sea islands

Syria’s Sharaa pledges to honor Russia ties, seeks economic and military support in Kremlin visit

Syria’s Sharaa pledges to honor Russia ties, seeks economic and military support in Kremlin visit

Top Shows

Vantage Firstpost America Firstpost Africa First Sports
Enjoying the news?

Get the latest stories delivered straight to your inbox.

Subscribe

QUICK LINKS

  • Mumbai Rains
Latest News About Firstpost
Most Searched Categories
  • Web Stories
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Tech/Auto
  • Entertainment
  • IPL 2025
NETWORK18 SITES
  • News18
  • Money Control
  • CNBC TV18
  • Forbes India
  • Advertise with us
  • Sitemap
Firstpost Logo

is on YouTube

Subscribe Now

Copyright @ 2024. Firstpost - All Rights Reserved

About Us Contact Us Privacy Policy Cookie Policy Terms Of Use
Home Video Shorts Live TV