Firstpost
  • Home
  • Video Shows
    Vantage Firstpost America Firstpost Africa First Sports
  • World
    US News
  • Explainers
  • News
    India Opinion Cricket Tech Entertainment Sports Health Photostories
  • Asia Cup 2025
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
Trending:
  • PM Modi in Manipur
  • Charlie Kirk killer
  • Sushila Karki
  • IND vs PAK
  • India-US ties
  • New human organ
  • Downton Abbey: The Grand Finale Movie Review
fp-logo
Kundankulam ready to generate power by October end
Whatsapp Facebook Twitter
Whatsapp Facebook Twitter
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
  • Home
  • India
  • Kundankulam ready to generate power by October end

Kundankulam ready to generate power by October end

FP Archives • September 28, 2013, 19:58:17 IST
Whatsapp Facebook Twitter

With fine-tuning of systems still on, power generation at the first 1,000 MW unit of the Kudankulam Nuclear Power Project (KNPP) is expected to happen October-end or November, a senior official said Saturday.

Advertisement
Subscribe Join Us
Add as a preferred source on Google
Prefer
Firstpost
On
Google
Kundankulam ready to generate power by October end

Chennai: With fine-tuning of systems still on, power generation at the first 1,000 MW unit of the Kudankulam Nuclear Power Project (KNPP) is expected to happen October-end or November, a senior official said Saturday. “Fine-tuning of systems are on. WE have gone up to 20 percent/200 MW power levels. We might start running the turbine next week. We have not run the turbine till now. WE are not in a position to put a date as to when the unit would be connected to the grid,” RS Sundar, site director of the KNPP told IANS over phone from Kudankulam. Sundar said the connection to the grid too is expected to happen October or November. The first unit at Kudankulam 99.74 percent complete, as of August 2013, officials said. [caption id=“attachment_1139867” align=“alignleft” width=“380”] ![PTI](https://images.firstpost.com/wp-content/uploads/2013/09/kudankulam-pti_27092.jpg) The second unit at KNPP is expected to start commercial operations in June next year. PTI[/caption] The Nuclear Power Corporation of India Limited (NPCIL) is setting up two 1,000 MW Russian reactors at Kudankulam in Tirunelveli district, around 650 km from here. KNPP is India’s first pressurised water reactor belonging to the light water reactor category. The first unit attained criticality, which is the beginning of the fission process, for the first time, July 13. The NPCIL had earlier said it would connect the first unit to the grid end-August, generating 400 MW power. But that did not happen due to two condenser valve problems which seem to have got stuck. “Everything is fine on the reactor side. The problem was at the electrical systems side and it was also sorted out,” the source said. The second unit at KNPP is expected to start commercial operations in June next year. The unit has achieved progress of 95.50 percent as of August. The NPCIL has loaded dummy fuel assemblies in the second unit. The dummy fuel assemblies are made of lead, instead of uranium, and are the exact replica of the actual nuclear fuel assemblies, both in dimension and weight. A total of 163 dummy fuel assemblies have been loaded into the core. According to a source, NPCIL has decided to train its focus on successful commissioning of the first unit and hence the work on the second unit is going a bit slow. IANS

Tags
India Chennai Civil Nuclear deal Kudankulam Nuclear Power Corporation Of India Limited nuclear deal NPCIL nuclear reactor
End of Article
Written by FP Archives

see more

Latest News
Find us on YouTube
Subscribe
End of Article

Impact Shorts

'New dawn': PM Modi meets Manipur violence victims in first visit since 2023 unrest

'New dawn': PM Modi meets Manipur violence victims in first visit since 2023 unrest

Prime Minister Modi visited Churachandpur, Manipur, meeting displaced people from ethnic clashes. Modi laid foundation stones for 14 development projects worth over ₹7,300 crore in Churachandpur. Opposition criticized Modi's visit as "too little, too late" and questioned its impact on healing wounds.

More Impact Shorts

Top Stories

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Top Shows

Vantage Firstpost America Firstpost Africa First Sports

QUICK LINKS

  • Mumbai Rains
Latest News About Firstpost
Most Searched Categories
  • Web Stories
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Tech/Auto
  • Entertainment
  • IPL 2025
NETWORK18 SITES
  • News18
  • Money Control
  • CNBC TV18
  • Forbes India
  • Advertise with us
  • Sitemap
Firstpost Logo

is on YouTube

Subscribe Now

Copyright @ 2024. Firstpost - All Rights Reserved

About Us Contact Us Privacy Policy Cookie Policy Terms Of Use
Home Video Shorts Live TV