Firstpost
  • Home
  • Video Shows
    Vantage Firstpost America Firstpost Africa First Sports
  • World
    US News
  • Explainers
  • News
    India Opinion Cricket Tech Entertainment Sports Health Photostories
  • Asia Cup 2025
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
Trending:
  • PM Modi in Manipur
  • Charlie Kirk killer
  • Sushila Karki
  • IND vs PAK
  • India-US ties
  • New human organ
  • Downton Abbey: The Grand Finale Movie Review
fp-logo
2.08-km long, Rs 535 crore and more… The new Pamban Bridge to be inaugurated by PM Modi on Sunday
Whatsapp Facebook Twitter
Whatsapp Facebook Twitter
Apple Incorporated Modi ji Justin Trudeau Trending

Sections

  • Home
  • Live TV
  • Videos
  • Shows
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Health
  • Tech/Auto
  • Entertainment
  • Web Stories
  • Business
  • Impact Shorts

Shows

  • Vantage
  • Firstpost America
  • Firstpost Africa
  • First Sports
  • Fast and Factual
  • Between The Lines
  • Flashback
  • Live TV

Events

  • Raisina Dialogue
  • Independence Day
  • Champions Trophy
  • Delhi Elections 2025
  • Budget 2025
  • US Elections 2024
  • Firstpost Defence Summit
  • Home
  • Explainers
  • 2.08-km long, Rs 535 crore and more… The new Pamban Bridge to be inaugurated by PM Modi on Sunday

2.08-km long, Rs 535 crore and more… The new Pamban Bridge to be inaugurated by PM Modi on Sunday

FP Explainers • April 6, 2025, 10:00:35 IST
Whatsapp Facebook Twitter

On Sunday, Prime Minister Narendra Modi will inaugurate the new Pamban Bridge, connecting Rameswaram to the rest of India. This 2.08 km-long structure, built at Rs 535 crore, is the country’s first vertical lift railway bridge. It will replace the 110-year-old construction, which had previously withstood a cyclone

Advertisement
Subscribe Join Us
Add as a preferred source on Google
Prefer
Firstpost
On
Google
2.08-km long, Rs 535 crore and more… The new Pamban Bridge to be inaugurated by PM Modi on Sunday
The new Pamban Bridge, connecting Rameswaram with mainland India, that will be inaugurated by Prime Minister Narendra Modi on Ram Navami (April 6), at Rameswaram in Ramanathapuram district of Tamil Nadu. PTI

On April 6 (Sunday), India will witness a sea-change. Prime Minister Narendra Modi will inaugurate the country’s first vertical lift sea bridge at Pamban, which will connect Rameswaram with mainland India.

The new construction will replace the original Pamban Bridge, which was opened to the public in 1914 and was shut down only in December 2022 due to extensive corrosion and safety concerns.

As we await the inauguration of the new Pamban Bridge, here’s a recap on the original one and why the new structure is considered an engineering marvel.

STORY CONTINUES BELOW THIS AD

Old Pamban Bridge that survived a cyclone

Before we dive into the features of the new Pamban Bridge, let’s do a quick recap of the old construction, which was thrown open to the public in 1914. Efforts to build such a bridge dates back to as early as the 1870s with the British administration planning to expand trade connectivity to Sri Lanka, then Ceylon.

However, the construction of the rail bridge commenced only by 1911 and it was commissioned on February 24, 1914, making it India’s first ever sea bridge. The bridge was designed by Scherzer Rolling Lift Bridge Company of Chicago and was constructed by Head Wrightson & Co Ltd of Thornaby-on-Tees England. Its span was named after Scherzer, the engineer who designed and executed it. The Scherzer span work began in July 1913 and was completed in six months by December.

More from Explainers
PM Modi lands in Sri Lanka’s Colombo for 3-day visit; defence, trade deals likely PM Modi lands in Sri Lanka’s Colombo for 3-day visit; defence, trade deals likely PM Modi honoured with Sri Lanka’s highest civilian honour ‘Mitra Vibhushana’ for boosting bilateral ties PM Modi honoured with Sri Lanka’s highest civilian honour ‘Mitra Vibhushana’ for boosting bilateral ties

1950s :: Pamban Rail Bridge Opens Up to Allow Ship Movement

Constructed In 1914 Pamban Bridge Was India's First Sea Bridge pic.twitter.com/zUmClMY1Le

— indianhistorypics (@IndiaHistorypic) March 14, 2019

Once built, the Pamban Bridge was the sole transportation link between mainland Ramanathapuram and Rameswaram island, which is situated just a few miles away from Sri Lanka. In fact, it remained the only transport link for over 70 years until a road bridge was built beside it in 1988.

Impact Shorts

More Shorts
Ghaziabad woman dead, pilgrims attacked in bus… How Nepal’s Gen-Z protests turned into a living hell for Indian tourists

Ghaziabad woman dead, pilgrims attacked in bus… How Nepal’s Gen-Z protests turned into a living hell for Indian tourists

Were bodyguards involved in Charlie Kirk’s shooting? The many conspiracies surrounding the killing

Were bodyguards involved in Charlie Kirk’s shooting? The many conspiracies surrounding the killing

In 1964, a severe cyclonic storm also known as the Rameswaram cyclone hit Tamil Nadu on December 23 and 24. Such was the severity of the cyclone that it wiped out the entire coastal town of Dhanushkodi . However, two days after the storm hit, when officials went to inspect they saw that the Pamban Bridge had withstood the storm, although it was quite damaged. Of the 146 spans, 126 washed away and two piers of the bridge also washed away.

STORY CONTINUES BELOW THIS AD

Shortly after the cyclone, E Sreedharan , who is now known as India’s Metro Man, was tasked with the restoration of the bridge and given just six months to do so. However, he exceeded everyone’s expectations and the Pamban bridge was up and running once again within 46 days. “I had a very ordinary, uneventful career in the Indian Railways from December 1954 to June 1990. No doubt, restoration of the Pamban Bridge gave me an excellent opportunity to demonstrate my technical and organisational competence,” he’s been quoted as saying to India Today.

Corrosion forces bridge to shut down

As years passed by, the Pamban rail bridge continued to stand tall offering to be a link between Rameswaram and mainland India. In fact, it was India’s longest sea link until the Rajiv Gandhi Sea Link, popularly known as the Bandra-Worli Sea Link, in Mumbai opened in 2010.

A ship goes past Pamban Bridge, connecting Rameswaram to Mandapam railway station in Tamil Nadu in 2019. Corrosion forced the bridge to shut down in 2022. File image/PTI

But corrosion started to weaken the structure. In 2020, monitoring systems imported from Germany helped extend the life of the structure for another two years. Train services were suspended in December 2022 and later permanently stopped after the sensors emitted alarm over excessive vibrations during train movement. The engineers felt that the bridge, which served for over a century, was beyond repair.

STORY CONTINUES BELOW THIS AD

A new engineering marvel

In 2019, the decision was taken to build a new Pamban Bridge and a foundational stone was laid for the same. Work was initially stalled for the bridge owing to the Covid-19 pandemic, but work was finally completed in November 2024 at a total cost of Rs 535 crore.

The new Pamban Bridge spans a total of 2.08 kilometre and stands three metres higher than the old Pamban Bridge. This allows the smaller ships to pass beneath without lifting the span. Moreover, on the new bridge, trains can operate at speeds of up to 98 kmph — compared to a speed of only up to 10 kmph on the old one. Also, the new Pamban bridge is engineered to handle significantly heavier loads, designed for 25 tonnes axle load.

Speaking on the structure, the Southern Railway said, “This new railway sea bridge between Mandapam railway station (mainland) and the Rameshwaram island is not just a replacement for the old Pamban Bridge; it represents a colossal leap in India’s engineering capabilities.”

The most outstanding feature of the new Pamban bridge is the state-of-the-art vertical lift mechanism, making it the first vertical lift railway sea bridge in India. The new bridge employs a vertical lift 72-metre central span that rises 22 metre above the water, allowing larger vessels to pass beneath with ease. Under rail traffic, the bridge remains simply supported at two ends thus ensuring absolute stability.

STORY CONTINUES BELOW THIS AD
The new Pamban Bridge, will connect Rameswaram with mainland India. It is considered to be India’s First Vertical Lift Railway Sea Bridge. PTI

“While the new Pamban Bridge is India’s first vertical lift sea bridge, it shares similarities with other globally recognized bridges known for their technological advancements and unique designs. These include the Golden Gate Bridge in the United States, Tower Bridge in London and the Oresund Bridge in Denmark-Sweden. Each of these iconic structures, though different in design and functionality, represents a pinnacle of engineering excellence.

“The new Pamban Bridge stands proudly in their company, combining cutting-edge technology with the challenges posed by India’s coastal and seismic conditions,” the Southern Railway said in an official release, quoting CMD of RVNL, Pradeep Gaur.

Officials involved in the construction of the new bridge also note the many challenges they faced. The Pamban bridge is located in the Palk Strait’s turbulent waters, causing great difficulty to the workers. Moreover, the region is highly susceptible to cyclones, which forced officials to consider careful planning.

India’s engineering marvel…

Pamban Bridge in Rameswaram pic.twitter.com/UJ4v8r3vWa

— Ashwini Vaishnaw (@AshwiniVaishnaw) March 27, 2025
STORY CONTINUES BELOW THIS AD

However, with its use of high-grade stainless steel reinforcement in concrete, the bridge is now not only able to withstand seismic activity but also corrosion.

“The new Pamban Bridge stands as a proud symbol of what India can achieve when innovation, tradition and engineering excellence converge,” said RVNL.

According to a News18 report, Prime Minister Modi will inaugurate the new Pamban Bridge on Sunday from a platform erected on the Pamban Road Bridge, where he will stand for the duration of the 12-minute inauguration sequence.

With inputs from agencies

Tags
India Narendra Modi
End of Article
Latest News
Find us on YouTube
Subscribe
End of Article

Impact Shorts

Ghaziabad woman dead, pilgrims attacked in bus… How Nepal’s Gen-Z protests turned into a living hell for Indian tourists

Ghaziabad woman dead, pilgrims attacked in bus… How Nepal’s Gen-Z protests turned into a living hell for Indian tourists

Prime Minister KP Sharma Oli resigned following violent protests in Nepal. An Indian woman from Ghaziabad died trying to escape a hotel fire set by protesters. Indian tourists faced attacks and disruptions, with some stranded at the Nepal-China border during the unrest.

More Impact Shorts

Top Stories

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

Russian drones over Poland: Trump’s tepid reaction a wake-up call for Nato?

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

As Russia pushes east, Ukraine faces mounting pressure to defend its heartland

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Why Mossad was not on board with Israel’s strike on Hamas in Qatar

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Turkey: Erdogan's police arrest opposition mayor Hasan Mutlu, dozens officials in corruption probe

Top Shows

Vantage Firstpost America Firstpost Africa First Sports
Latest News About Firstpost
Most Searched Categories
  • Web Stories
  • World
  • India
  • Explainers
  • Opinion
  • Sports
  • Cricket
  • Tech/Auto
  • Entertainment
  • IPL 2025
NETWORK18 SITES
  • News18
  • Money Control
  • CNBC TV18
  • Forbes India
  • Advertise with us
  • Sitemap
Firstpost Logo

is on YouTube

Subscribe Now

Copyright @ 2024. Firstpost - All Rights Reserved

About Us Contact Us Privacy Policy Cookie Policy Terms Of Use
Home Video Shorts Live TV